Melbourne Terminal Station, VIC

Project Background:

Access Covers Australia successfully provided a solution for covering a cable trench that was 3.5m wide x 30m long.

Working alongside the design consultants and our clients, we designed a trafficable system that provided access at all points throughout the 30m trench.

 

Solutions & Products Supplied:

  • Ductile iron removable support beams
    Ductile iron removable support beams (eliminated the issue of dissimilar metals) ensuring the entire system was manufactured in the same material to avoid corrosion over time

  • Overcame issues of beam depths along the trench that allowed for a continuous, uniform rebate on all sides

  • Fully certified product to AS3996:2019

  • Reduced manufacturing time by 80% compared to the traditional method.

  • Huge time savings on installation with innovative design
    > Setup of the concrete trench
    > Delivered fully assembled (in 20x parts)
    > Installation of all 116-parts fitted in 6 hours instead of 56 hours using the traditional method.

 