About the project: 


As part of the Sunbury Line Upgrade, an electrical substation in Albion was built to provide essential power for bigger, more modern trains to run along the line — improving the capacity, reliability, and frequency of services for passengers.

Read more about this project

 

How Access Covers Australia Added Value: 

Due to time restraints and labour access on site, our client required large custom precast pits and covers to be manufactured. Metro Trains Melbourne's design specified 250mm thick walls with cast-in rebates for MACS to sit within the structure.

 

Key product features included:

  • Bell mouths cast into pit wall
  • Pulling eyes and earthing ferrules cast into pit wall
  • Twin-layer steel reinforcement cage
  • Fully assembled MACS unit delivered and placed at the same time as pit delivery

 

CONSIDER US FOR YOUR NEXT PROJECT:

Speak to one of our trusted experts for your next project needs.  
Our ability to manufacture Australian standard concrete and steel products is what sets us apart! 

Call (03) 9335 5355 or request a call back

Rail - infrastructure